The renovation section of Zhanxi Avenue is approximately 740 meters long. All the original double-sided high and low-arm LED street lights have been completely removed and rebuilt. Through multi-column integration, multi-box integration, and multi-network integration, this project achieves efficient construction by integrating various types of poles such as street lamps, traffic lights, and surveillance equipment. It also incorporates intelligent sensing devices like video, radar, and environmental monitoring to establish a comprehensive and precise perception system. At the same time, it significantly enhances the road’s traffic capacity and lighting quality, while achieving comprehensive energy savings and infrastructure sharing, co-construction, co-management, and creating a high-quality gateway landscape avenue.
